Week 3: SAM_1893 So as we are waiting for delivery of the gravel, sand and pavers over the holiday weekend, I was chatting with my friend, Michelle. I was mentally worrying the logistics of deliveries (oh please, let the gravel come first; nope, here comes the first of two paver deliveries and the timbers) when she asked how much gravel was being delivered and I absently responded 26 tons of gravel, 13 tons of sand, etc. Her response which actually got through my crowded brain was “Wow….so 26 elephants worth of gravel!” So when the gravel finally arrived and was dumped in the area….I kept looking at it and thinking, “That doesn’t look like 26 elephants worth of gravel…hmmmm.

SAM_1928 SAM_1932

And when the 13 tons of sand was delivered and the 11 tons of pavers, again I thought, “That doesn’t look like that many…..”

SAM_1897 SAM_1933
five elephants Throughout last weekend, we all got a kick out of using elephants of measurement and all agreed that although there were huge heaping piles of materials, it didn’t look like that many elephants! A little research after the fact found that the average weight of an adult elephant is between 2-7 tons. Taking the average, let’s say 5. So 5 elephants worth of gravel, 2 elephants worth of sand and 2 elephants worth of pavers.Throughout the last two weekends, while actually raking and spreading gravel and sand, lifting and maneuvering the gas-powered tamper machine, digging the trenches for the timbers and setting the pavers etc., I am now much more inclined to go with the original elephant math!
SAM_1935 Friday, May 23: Delivery of materials and initial spreading of gravel (girls only: Bobby, Kelly & Laurie)
SAM_1942 Saturday: Continuation of gravel spreading, cutting of half pavers, tamping and laying down of yet more ground cloth (Ray, Bobby, Kelly, Laurie and hired helpers: Daniel, Ted and Victor).
SAM_1949 20140524_085556
Girls enjoying the fun power tools!
SAM_1955 SAM_1965
SAM_1959 SAM_1961
Stupid tree root from the poison ivy tree which took up at least 2 hours of time trying to dig it out.
SAM_1964 SAM_1973
SAM_1976 Sunday: Raking, spreading, tamping and leveling of sand. First few rows of pavers laid (Ray, Bobby, Kelly, Laurie, Tammy and Daniel).
SAM_1978 SAM_1988
SAM_1992 SAM_1993
SAM_1995 SAM_2004
SAM_2007 Monday: Continued setting of pavers (Ray, Bobby, Kelly & Laurie)
SAM_2011 Week 4:Saturday: Gungho and sure we can finish this. Hard pushing and by 3 p.m. on Sunday, we are 70 pavers short. Almost finished. Sand in the pavers makes it look amazing!!!
SAM_2014 SAM_2020
SAM_2021 Week 5:So this weekend, we have the last 70 pavers to put down and there is sand to sweep in and we need to trim up a few pavers and finish backfilling with gravel. Then, Kelly will begin with the magic pixie dust and turn this space into an awesome retreat for morning coffee and sunset cocktails!
tired elephant Overblown project almost finished? Check! I am one tired, happy elephant.

elephants